Pump Station Design Standard

Pump Station Design Standard2019-01-15T19:35:04+00:00

Project Description

The City of Milford is growing quickly, and each new development usually comes with a sewage pumping station. The City wants to standardize their pump stations designs for ease of maintenance, reduced spare parts, collection of key information and compatibility with future changes to their telemetry and Supervisory Control and Data Acquisition (SCADA) systems. Duffield met with the City Engineer and SCADA Technician to survey their existing system and determine their preferred equipment. Duffield then incorporated this information into a Standards document. The City will give this Standard to developers for guidance on new pump stations and use it as guideline for upgrade of their existing pump stations.

Services

  • Electrical Engineering